АО «Дальэнергомаш»
Published on АО «Дальэнергомаш» (http://www.dalenergomash.ru)

Home > Gas Process Turbines > For АК-72 Line

For АК-72 Line

Print version

Complex machine set (CМА-2М) and gas process turbines (GTT-12) are used in production lines of low concentration nitric acid AK-72.

Competitive advantages and design features of СМА-2М (GTT-12)
 

  • Balance of  turbine operation owing to redistribution of power between High Pressure Turbine (HPT) and Low Pressure Turbine (LPT)
  • Updating design of 1150-42-1 nitrous gas compressor
  • Increasing the axial compressor’s capacity more than 10% 
  • Absorption of excess deformation bellows compensator owing to upgraded design of the midcase
  • Reducing the temperature loads onto the midcase owing to relocation the cooling manifold  to the HPT diaphragm outside the case
  • Minimization of leakage in the horizontal split owing to the width augmentation of inlet nozzle flanges and the use of an additional fastening means
  • Self-tightening of splits during heating due to changing materials of case-constituting parts

Technical characteristics 

Parameters

Unit

GTT-12

CМА-2М

Pressure before axial compressor (AC) 

kgf/cm2

0,96

0,96

Pressure at outlet from axial compressor (AC) 

kgf/cm2

3,9

4,6

Pressure behind nitrosegas compressor (NC) 

kgf/cm2

10,5

12,2

Pressure before high-pressure turbine (HPT) 

kgf/cm2

9,05

10,5

Rotational speed of low-pressure turbine (LPT) 

rev./min 

5200

5200

Rotational speed of high-pressure turbine (HPT)

rev./min 

5000

5000

Temperature of atmospheric air 

0С

20

20

Gas temperature before turbine

0С

760

760

Gas temperature behind turbine

0С

367

357

Air temperature behind axial compressor (AC)

0С

190

215

Gas temperature before nitrose gas compressor (NC)

0С

65

70

Air consumption supplied to processing (total) 

m3/hour

245000

283000

 

Service lifefactors

  • Average over haul period – not less than 15000 hours when the number of starts is not more than 50
  • Average overhaul period – not less than 30000 hours when the number of starts is not more than 100
  • Total life period – not less than 120 000 hours when the number of starts is not more than 320
  • When reducing  the number of starts exceeds the values shown above, the service life period is 100 hours after each emergency stop, and by 50 hours after each normal start
  • After overall reconditioning, CМА-2М (GTT-12) and its sub-units acquire new service life factors
  • Working blades of high-pressure turbine – 45 000 hours 
  • Guiding vanes high-pressure turbine – 60 000 hours 
  • Disks of high-pressure turbine – 60 000 hours 
  • High-pressure turbine casing-constituting parts – 120 000 hours 
  • Insertion piece – 60 000 hours 
  • Minimization of leakage in the horizontal split owing to the width augmentation of inlet nozzle flanges and the use of an additional fastening means
  • Self-tightening of splits during heating due to changing materials of case-constituting parts

 

*Specify the price and receive additional information in Sales Department​:
tel: +7 (4212) 381-461, 381-851

e-mail: export@dalenergomash.ru [1]

 


Links
[1] mailto:os@dalenergomash.ru